Chinese and U.S. photovoltaic installations to reach parity in 2011

Nov. 8, 2011
San Francisco, CA--According to Solarbuzz, 195 PV projects with a total capacity of over 1.8 GW will be installed within China in 2011, closely matching the U.S. installed capacity this year.

San Francisco, CA--According to the SolarbuzzChina Deal Tracker report, 195 projects, with a total capacity of more than 1.8 GW, will be installed within 2011. That installed capacity in China will closely match the installed capacity in the U.S. this year. Falling module and balance of system (BOS) prices have significantly improved photovoltaic (PV) project internal rates of return (IRR) and led to an explosion in project development activities in China.

Solarbuzz staff have identified 1104 non-residential projects in China that are installed, being installed, or in development. Projects in the pipeline are located in 29 Chinese provinces. Qinghai, Gansu, Ningxia, and Inner Mongolia are the leading provinces in megawatt terms, followed by Sichuan, Jiangsu, Shandong, Shaanxi, Tibet and Anhui. These 10 provinces represent 86% of the total pipeline.

Stimulated by the Qinghai 930 program as well as unified national feed-in tariff (FIT) policy, 54% of the capacity in megawatt terms will be located in the northwest region. The top seven project developer groups account for nearly 1 GW of PV demand in 2011, including state-owned enterprises China Power Investment Corporation, China Guodian Corporation, China Huadian Corporation, China Guangdong Nuclear Power Holding Corporation, and China Energy Conservation & Environmental Protection Group. The CHINT Group is the only private enterprise among the top seven developers.

"Projects entitled to the Golden Sun and Solar Rooftop programs will enjoy the highest IRRs in Q4’11 and 1H’12," said Ray Lian, Solarbuzz analyst. "As a result, the market share of the building-mount segment in China will show a significant increase over the next several quarters." In the current project pipeline, building-mount projects only account for about 10% of total capacity. If system prices continue to fall, electricity generation by PV will become economic for self-consumption by industrial and commercial users in provinces such as Zhejiangas early as 2013. This will greatly stimulate building-mount project development by the corporate sector in China.

The Solarbuzz China Deal Tracker reports project activity in the non-residential segment, including utilities. The database includes a variety of parameters for every tracked installation: project name, project developer, owner or host, system size (MWp and average annual MWh), installed system pricing, system type (ground mount, rooftop, BIPV, off-grid), region, province, city, exact location, project progress, incentive program, installer, module and inverter suppliers, module type, project developer and installer contact details.

SOURCE: Solarbuzz; www.solarbuzz.com/our-research/recent-findings/photovoltaic-installations-china-reach-same-level-us-2011

About the Author

Gail Overton | Senior Editor (2004-2020)

Gail has more than 30 years of engineering, marketing, product management, and editorial experience in the photonics and optical communications industry. Before joining the staff at Laser Focus World in 2004, she held many product management and product marketing roles in the fiber-optics industry, most notably at Hughes (El Segundo, CA), GTE Labs (Waltham, MA), Corning (Corning, NY), Photon Kinetics (Beaverton, OR), and Newport Corporation (Irvine, CA). During her marketing career, Gail published articles in WDM Solutions and Sensors magazine and traveled internationally to conduct product and sales training. Gail received her BS degree in physics, with an emphasis in optics, from San Diego State University in San Diego, CA in May 1986.

Sponsored Recommendations

Request a quote: Micro 3D Printed Part or microArch micro-precision 3D printers

April 11, 2024
See the results for yourself! We'll print a benchmark part so that you can assess our quality. Just send us your file and we'll get to work.

Request a free Micro 3D Printed sample part

April 11, 2024
The best way to understand the part quality we can achieve is by seeing it first-hand. Request a free 3D printed high-precision sample part.

How to Tune Servo Systems: The Basics

April 10, 2024
Learn how to tune a servo system using frequency-based tools to meet system specifications by watching our webinar!

Precision Motion Control for Sample Manipulation in Ultra-High Resolution Tomography

April 10, 2024
Learn the critical items that designers and engineers must consider when attempting to achieve reliable ultra-high resolution tomography results here!

Voice your opinion!

To join the conversation, and become an exclusive member of Laser Focus World, create an account today!